Monday 8 July 2013

Panel test report format






Xyz Company
uvw nagar , India 

REF.NO--------------                                                                                                                                   DATE-------

TEST REPORT

CUSTOMER                                         :              
ORDER REFERENCE                          :
PRODUCT                                            :
PANEL SR. NO------------                      DRAWING NO. ----------------                                     QUANTITY ----- ----
SYPPLY VOLTAGE ……………….               CONTROL VOLTAGE ………………                                  AMPERE ------------
The following routine test and inspection were carried out on the above control panel.

GENERAL INSPECTION
  1. Verification of bill of material and rating of components                             ---------------------------------
(As per drawing no……………………………………..
  1. Overall &Mounting of dimension of panel                                                        -------------------------------
(As per drawing no……………………………………..
  1. Power wiring and control wiring of components                                           ---------------------------------
(As per drawing no……………………………………..
  1. Paint finish and overall appearance                                                                   --------------------------------
(Inside ……………………………outside……………………..

ELECTRICAL OPERATION AND TEST
  1. Verification of control transformer                                                              ------------------------------------
  2. Verification of proper function of all components                                     ---------------------------------
  3. Verification of correct sequence of operation                                             ----------------------------------   
DI-ELECTRIC TEST
  1. High voltage test conducted at -------KV Voltage for 1 minute                                        seconds       
  2. Between each pole and earth                                                                                           ---------------------
  3. Between the poles when contacts are open                                                                   ---------------------
INSULATION RESISTANCE TEST
  1. Measurement of insulation resistance with 500/1000V DC Megger                               Mega –ohm
  2. Between each pole and earth                                                                                          ---------------------
  3. Between the poles when contacts are open                                                                 ---------------------



Client’s Rep…………………………..                                             Tested by ………………
Reviewed by ………………….    

                                                                        For xyz co.                   

2 comments:

One Nation, One electrical License

Electrical contractors are facing license problem when they bid for another state. Generally they are entitled to do work in particular stat...