Wednesday, 13 May 2015

Feeder Pillar Panel technical specification


 Feeder Pillar Panel  typical- technical specification 

Supply of metal clad, Pedestal mounted 415 volts. Feeder Pillar Panel made of CRCA Sheet, Powder coated painting on a suitable size angle iron frame (MS channel base for grouting in the RCC and proper gland in the bottom) with required hardware such as nuts, bolts, washers, provision for earthing with 40mmx5mm GI strip on both sides of the feeder pillar panel, complete with Ammeter & Voltmeter along with selector switches and CTs, LED indicating lamps for each phase with the technical specification as given below-
·         Incoming: 250 A SFU with 250 A HRC fuse.
feeder pillar typical
·         Outgoing: Five Nos. of outgoing SFU units of rating 125 A with 125 A HRC fuse.
·         Aluminum bus bar & Interconnecting copper wires.
·         The feeder pillar will be having one 10 Amp 3 pin socket outlet with 10 Amp switch and one brass batten holder fitted in metering panel compartment and directly fed from incoming.
·         The overall dimensions of the feeder pillar shall be 1500x1200x 700 mm (LengthxWidthx depth) and thickness of the CRCA sheet shall be 14 SWG.
·         MS Angle iron size for frame shall be 50mmx50mm.
·         Feeder pillar panel shall be of class IP-55 & a canopy shall be provided at its top to protect the feeder pillar panel against the rain &  sunlight.
·         Feeder pillar panel shall be of double door type with provision of gasket. Provision of transparent sheet shall be made to take reading of Ammeter & Voltmeter with out opening the door.
·         Incoming to Feeder Pillar cable size: At least 2x3.5cx185 sqmm.
·         Outgoing from FP cable size: at least 3.5cx70 sqmm.
·         Cable entry/ outgoing from bottom through PVC glands only.
·         Powder coating shade shall be RAL 7032 with a thickness of 80 micron minimum.
·         Neutral cables for incomer and outgoing will be terminated in neutral bus bar.
·         Lifting hook to be provided for easy handling of Feeder Pillar Panel.
·         Pedestal shall be made of RCC mixture 1:1.5:3.
·         All dimensions are in mm. General tolerances on dimensions ±10 mm.
Manufacturer have to submit GA drawings with exact size and arrangement of all the components of reputed brands for approval.


carbon emission v/s electrical appliance

Save Energy Save Environment
The negative effect of human activities on environment is not only seen in India but also in whole world. It results like ‘global temperature ‘or global warming’. The reduction of energy sources and rising ratio of carbon in environment has worried us all. Greenhouse Gas (abbreviated GHG) is a gas in an atmosphere that absorbs and emits radiation within the thermal infrared range. This process is the fundamental cause of the greenhouse effect.
Sulphur oxide(SOx)
CO2 emission per capita
Carbon dioxide (CO2)
Methane (CH4)
Nitrous oxide (NOx)
Ozone (O3)
CFCs (Chloro Fluro Carbon)

This concept is wrong that global warming is caused only from operations of thermal plants, factories etc. The carbon emission is also caused from Electrical Appliances, like-

The AC s and fridges are contributing more to carbon emission. An average calculation is that Carbon emission from household appliances is 1190 kg Per Annum per family. The average household creates 10 Tonnes of CO2 per year in UK and 22 Tons of CO2 in the US as a primary carbon footprint.
CO2 emission in kg per annum

Reduction in carbon emission from zero electricity hours-
Ø  Load 3 MW = 3000KW, Power Cut Time:30 minute per month
Ø  Load in KWH =3000KWx0.5H = 1500 KWH or Unit
Ø  Carbon emission per month = 1500UX 0.69 Kg CO2 = 1035Kg CO2 emission saved
Carbon emission saving ANNUALLY =1035 X12= 12420 KG =12.4 ton

 (Ref: http://www.epa.gov/cleanenergy/energy-resources/refs.html), CO2 emission = 6.89 × 10-4 metric tons CO2 / kWh

Energy saving from zero electricity hours-
Ø  Load 3 MW = 3000KW, Power Cut Time:30 minute
Ø  Load in KWH =3000KWx0.5H = 1500 KWH or Unit
Ø  Cost of saving = 1500 x @Rs.7.00 = Rs.10500/-
It will be a great contribution to energy conservation & sustainable development to environment. Every unit of electricity or gas that we use results in carbon dioxide (CO2) emissions to the atmosphere. If we reduce our electricity then we save money and reduce the CO2 emissions and we should be responsible for that.

Tuesday, 21 April 2015

A practical guide to cable installation and tool box talk

A practical guide to cable installation and tool box talk 
A practical guide to cable installation, wire and tool box talk is a comprehensive coverage on every aspect of estimation, installation, testing and commissioning of cable and wire. In this book it is intended to serve as ready reference for electrical engineers, contractors, architects, estimators, students and academicians. 
The book has been divided in three p
A practical guide to cable installation and tool box talk 
arts
v Concept on cable
v Cable accessories and
v Tool box talk.

v  CONTENTS
-  Concepts on Cable; Cable Construction; Cable Application and Size; Cable Manufacturing   Process;
-Cable Manufacturing; Cable Insulating Material; Electrical Characteristics of   Cable; Cable Conductor;
-Typical XLPE Power Cable (11 KV & 33 KV) Specification;

  Communication Cable; Handling & Storage of Cable; Selection of Cable;
-Junction Boxes;

  -Cable Fault Location; Heating in Cable; Corrosion in Underground Power Cable; Test on

  Cable;
-Typical Test Equipments for Wires and Cables; Cable Installation or Cable Laying;

 - HV Cable Sheath Earthing Bonding; Electrification of Small House; Abbreviation;
-Cable   Terminology; Electrical Glossary; Thumb Rule;
-Standards on Cable;
-Schedule of Rate (SOR); Tool Box Talk
Tool box talk is very special for safety and production point of view. Supervisors and contract manpower will be benefited in day to day work.

Available with book shop and -


Price: Rs. 375/- excluding delivery charges
web: www.discoverypublishinggroup.com

Friday, 7 November 2014

Ceiling fan technical specification

 
Ceiling fan technical specification
Type test report shall indicate clearly the following parameters:-

1 a) Blade angle at root, elevation and at tip
  b) Width, thickness and material of the blade.
  c) Capacitance value.
  d) Material of the body of the fan motor
  e) Total weight of the fan motor.
2. Blade thickness without paint is not less than 1.0 mm for sweep 1200 mm.
3. The material of the fan blade shall be of designation 31500B with condition Hx6 Aluminium Alloy Sheet conforming to IS:737/2008.
4. The load bearing bolt shall be of min. 6 mm dia with aluminum Clamp, Spring Washer, Nut and Check nut and Split Pin.
5. Down rod shall be of 1.6 mm nominal thick ERW pipe.
6. Shackle made from 2 mm nominal thick CRC sheet
7. Bolts (2 nos.) shall be 6mm with Spring Washer Nut and Check nut and Split Pin.
8. Shank shall be made of CRC sheet of thickness 1.6 mm minimum without paint for all sizes.
9. Shackle cover: poly propylene.


Note to Bidders:
a) The bidder is authorized dealer, distributor or OEM (original equipment manufacturer).
b) In case of dealer or distributor, the certificated to be submitted along with offer.
c) The manufacturer shall maintain themselves all test like rpm, speed, insulation test, HV test etc as per relevant ISI.
d) The bidder has to send any 10 nos. of test repot of ceiling fans with serial no before dispatch of fans.
e) The COSTOMER reserves right either to inspect at shop floor or can give dispatch clearance by reviewing the test repot at sole discretion of IOCL.
f) The COSTOMER may witness any 10 samples at random at shop floor at sole discretion of IOCL.
g) Warrantee is not less than 02 years.

Specifications of 1200 MM  C/FAN

1. Rated voltage   : 220-240 v, AC, 50 Hz.
2. Rated speed     : 340 -370 r.p.m.
3. Rated air delivery: 210 m³/min.
4. Power consumption: Not more than 63 watts.
5. Class of insulation: B
6. Power factor: More than 0. 9
7. Motor body cover: Al. pressure die casted & CRCA sheet
8. Capacitor   : 1.6- 2.0 mfd.
9. Ball bearing: Double ball bearing.
10. Blade: Blade of Al. alloy sheet with 3 nos. blade.
11. Down rod: 300 mm long, Cold rolled pipe
12. Shackle assembly: With Al. spacer clamp for additional safety
13. Insulation test   : Not less than 2mega ohms.
14. HV Test   : With 1.5kv Voltage for 1min.
15. Leakage Current: Not more than 210 mili amp.

Tuesday, 30 September 2014

Transformer oil filtration machine Typical


The oil filtering machine is a portable device used for filtering the transformer oil and switchgear oil. He oil is circulated through filtering plant for several hours till the desired dielectric strength (above 40kv) of oil and PI (polarisation index, value, equal or mare than 1.3 desirable) are achieved.

The following impurities are removed-

·         Dissolved moisture, free water
·         Solid particle
The oil filtration plant having the enlisted component-
·         Degassing chamber: A vacuum chamber  is provided with special packed columns to degas the oil. It can be in single or multiple stages.
·         Vacuum pumping System: Quality high vacuum pumps and accessories.
·         Filters: Capable to size-filter the oil to rated micron size.
·         Heating system: Tube and shell constructed, indirect type (heaters placed in protection tubes), gentle heating exchangers, Division of power in groups with selective thermostatic controls for larger capacities.
·         Inlet pump: Vacuum-tight trouble-free positive displacement gear pump.
·         Outlet pump: Special Mono-block/Glandless/Canned Motor/Centrifugal pump.
·         Valves: Vacuum-tight manual, automatic and anti-suck back valves.
·         Control panel: Centralized control panel with electrical switchgear and an illuminated flow of diagram.
The temperature of 70 deg.C is maintained during circulation of oil. The filter plate in the filter unit removes the solid particles. The heated oil is passed through spray chamber and vacuum chamber to remove free water particle and the moisture.


Typical filter plant
Flow rate                                              : 200litres/hr
Filtration
Method                                                : edge type
Performance                            : 99.6% (efficiency at 1 micron)
Vacuum treatment
Normal vacuum pump performance    : 10torr (in vacuum chamber)
Optional start up made                                     : 50 torr
Vacuum pump capacity                                   : 6m/hr
Vacuum degassing performances
Moisture –single pass               100ppm→20ppm
                Triple pass               100ppm→10ppm
Gas          –single pass             100%ppm→1%ppm
                Triple pass               10%ppm→<1%ppm
Control parameter
Instrumentation                                    : pressure/temperature /vacuum
Automatic switching                            : high level, low level
Input power
Power supply   : 240V AC, 50htz, single phase, 32A
Power              : 6.15 KW
Auxiliaries
Inlet hose         : 6m
Outlet hose      : 6m
Power cable     : 12m, 2CX6sqmm copper or 2Cx10 sqmm AL, earth wire separate cu, 2.5 sqmm.

Dimension and weight
Overall dimension                   700x600x1280 mm
Weight                                                 160 kg (dry)

Monday, 29 September 2014

powder coating of panel


Powder coating Painting

Powder coating is an advanced method of applying a decorative and protective finish to a wide range of materials and products that are used by both industries and consumers. The powder used for the process is a mixture of finely ground particles of pigment and resin, which is sprayed onto a surface to be coated. The charged powder particles adhere to the
electrically grounded surfaces until heated and fused into a smooth coating in a curing oven. The result is a uniform, durable, high-quality, and attractive finish.


Purpose:
The basic purpose is to carry out pre-treatment before powder coating. Normally 7-10 tanks are used for hot process for cleaning before applying the powder coat. General practice is to follow the best of standards in the implementation of “Seven Tank Process”.
Typical size: seven tanks are made of Poly Propylene and the size of each tank is (2600 L X 1400 B X 2500 D) mm

TANK-1                      DEGREASING
TANK-2                      WATER RINSE-I
TANK-3                      DERUSTING
TANK-4                      WATER RINSE-II
TANK-5                      SURFACE ACTIVATION
TANK-6                      PHOSPHATING
TANK-7                      WATER RINSE-III
TANK-8                      PASSIVATION

1. DEGREASING
Room Temperature Process, Duration-30-40 Minutes, For-Cleaning the Sheet Metal Surface of grease, oils, soils, lubricants, oxide films, Heat Treatment/welding Scales etc. by ALKALINE DEGREASER.

2. WATER RINSE-I
Rinsing Process is Carried out.

3. DERUSTING
Room Temperature Process, Duration-20 Minutes, For-Cleaning The Sheet Metal Surface of Rust by Mixed HYDROCHLORIC ACID.

4. WATER RINSE-II
Rinsing Process is carried out.

5. SURFACE ACTIVATION
Room Temperature Process, Duration-20 Minutes, For-Activating the Sheet Metal Surface for Zn & Mn phosphate Coating by ACTIVATION CHEMICALS.

6. PHOSPHATING
Room Temperature Process, Duration-5-20 Minutes, For-Smooth & Uniform Coating of Sheet Metal Surface with Zn Phosphate by ZINC PHOSPHATE SOLUTION

7. WATER RINSE-III
Rinsing Process is carried out.

8. PASSIVATION
Room Temperature Process, Duration-15-20 Minutes, For-Sealing Pores of Sheet Metal Surface for obtaining Maximum Corrosion Resistance over Phosphate Coating by DECXYLITE SOLUTION

OVEN DRYING
150 Deg c Process, Duration-10-20 Minutes, For- Drying Sheet Metal Parts by hot air.

POWDER COATING

Done within 24 Hrs of Oven Drying, Sheet Metal parts are Coated with Powder of shade desired by client through Spraying in Spray Booths, and then Epoxy-Powder Coated/Sprayed Sheet Metal parts are baked in Electrically Fired Oven at 140-150 Deg c for 10-15 Minutes


Surface preparation.
Surface preparation includes

Cleaning – mechanical or chemical
Mechanical cleaning includes methods like scratch brushing and sand blasting. This by abrasive action not only removes the surface impurities but also eliminates scratches and surface irregularities. Cleaning is very good; however, coating must be done immediately because the cleaned surface is in a highly reactive state and corrosion occurs very soon. Chemical cleaning includes removal of dirt, oil and grease, and the oxidation products present on the surface by means of chemicals. The chemicals may be applied by wiping, spraying or dipping. The nature of chemicals used depends upon the base metal.


Application of conversion coating:
These are applied for three purposes:
a) To provide temporary in process corrosion protection before application of powder coating.
 b) To promote good adhesion of the powder coating to the substrate.
c) To impart under paint corrosion & thereby improve the life of the powder coating.
The type of the conversion coating used also depends upon the base.

PRETREATMENT FOR MILD STEEL
TENDENECY OF MATERIAL: - picking up rust when exposed to atmosphere bare.
NEED OF CLEANING - Presence of oil, grease, rust and black scale on the surface. Mild Steel material is known for its tendency of going under rapid oxidation when exposed to atmosphere bare. The result of oxidation is the formation of oxide layer on the surface which we commonly call as ‘RUST’.
To avoid this oxidation or rusting, the mild steel material is not allowed to get directly exposed to atmosphere. For this, we generally find rust preventive oil on the surface of mild steel material. The oil does not allow the material to come in direct contact with air and thus delays oxidation. However, this doesn’t entirely eliminates the problem of rusting and it only delays the process of rust formation.
Some mild steel materials are hardened for strengthening and similarly some are welded during fabrication. Both these processes leave black scale on the surface.
It concludes that mild steel parts generally have rust and/or grease-oil and/or black scale on the surface. All these cause severe problems of bonding if not removed before application of paint.
NEED OF CONVERSION COATING – The bare metal being extremely susceptible to atmospheric corrosion should be applied with conversion coating Before painting, once the rust, oil and scale are cleaned, the bare metal is again exposed for oxidation. To avoid this, the material has to be coated with some type of conversion coating which prevents further oxidation before applying paint and also gives adhesion for paint.

DEGREASING –
 Removal of oil and grease from the surface-
This can be done by Solvent Based Degreasing:- Petroleum based solvents have excellent degreasing abilities but are not commonly used because they are highly inflammable.
Alkaline degreasing powders:-
This is generally a blend of alkalies and surfactants. This is advised to be used under hot conditions. However, alkaline powders are also used under cold conditions as knock out degreasing stage.
Acidic Degreasing:-
These are solvent based liquids which are acidic in nature. They remove rust as well as grease under cold conditions. The bath of these chemicals is however, much expensive as their concentration is much higher than alkaline degreasing.

DERUSTING – Removal of rust and light scale from the surface.
These are necessarily acidic chemicals unlike degreasing, which may be alkaline in nature. The chemical is generally a blend of mineral acids like phosphoric acid, sulphuric acid and hydrochloric acid with added inhibitors. Higher acidity will result in faster removal of rust. However, this will affect the life of the coating applied later. Phosphoric acid based de-rusting chemicals are most suggested for pre-treatment of mild steel before applying paint.

CONVERSION COATING FOR MILD STEEL
The most common types of conversion coating include:
- Zinc phosphate coating
- Iron phosphate coating

Zinc phosphate coating is crystalline heavy coating gray in colour. While iron phosphate coating is amorphous conversion coating that ranges in colour from iridescent blue to gray.
Iron phosphate coating gives minimum sludge formation and hence smoother finish than zinc phosphate. Apart from this the bonding characteristics are also good. Iron phosphate processes are much easier to operate than zinc phosphate processes and require fewer process stages (zinc phosphate coating requires a pre-dip in activation chemical prior to phosphating to have micro crystalline grain structure), but iron phosphates do not provide the degree of  corrosion protection imparted by zinc phosphates.

Iron phosphate systems are therefore used for a range of products requiring a durable finish that are not exposed to severely corrosive environments. Zinc phosphating processes have been developed to provide exceptional painted part durability in corrosive requirements. Typical industries using zinc phosphate processes include automotive, appliance and truck and bus.
POST-TREATMENT
After a metal surface receives a conversion coating, the surface is water rinsed to remove un-reacted conversion coating chemicals and a post-treatment is applied. The post-treatment can provide a two- to ten-fold increase in corrosion resistance and humidity resistance when compared to conversion coatings without final rinses. Post-treatments are generally based on chromic acid.

Problems Because Of Improper Cleaning:-
1. Appearance of oily patches.
2. Appearance of pin holes.
3. Appearance of rusty surface beneath powder coating film.
PROBLEMS BECAUSE OF IMPROPER CONVERSION COATING:-
1. Reduced resistance to weather.
2. Reduced mechanical resistance.
3. Poor finish of the powder coating film.
PROBLEMS BECAUSE OF IMPROPER DRYING:-
1. Appearance of pin holes.
2. Poor bonding of the powder coating film.
These problems can be avoided by the choice of right process – right chemicals and right  maintenance of the chemicals.

Schedule of rate, SOR /rate for Diffuser/filter cleaning of substation

SOR Description Unit Rate Remarks x10 Diffuser removal, cleaning and refixing – Cleaning of diffuser/filter of bus duct, air duct, AC/HVAC d...