Scheme: Water
conservation and installation of RO (reverse osmosis) water treatment Plant at Bral
residential company.
Background
There are 11 no. submersible pumps installed by which ground water is
pumped to water tank. Drinking water is being supplied from overhead tank to
residential quarter. The groundwater is depleting and alternate source is also required
to overcome in future.
Philosophy/feasibility:
There is water pond at colony having the
reservoir capacity 60000 KL (approx annexure-I) which is lying idle and
currently under no use. The rain water is to be collected in water pond. Water can be piped in from existing pond and
run through a filtering compartment (approx 10 KL/H) that uses sand and gravel
to rid the water of foreign debris. The Supply of fully treated and safe
water is as per the WHO standard. If implemented, could go a long way in the
conservation and utilization of the traditional surface water sources.
Success ref: -
|
Sulabh International’s water treatment
solution converts contaminated pond water into pure drinking
water and bottle it. The plant is producing around 10,000 liters
of pure drinking water daily. By treating accumulated rainwater into
bottled water with the use of technology, pure drinking water is being
made available to people at just Rs.10 for a 20-liter
pack i.e 50 paise per liter. |
Method:
A jet pump shall be
installed near pond for the suction of water from the pond and will be fed to
water filtration plant. The filtered water shall be injected to existing water
network as shown below-
The treated water is
safe for drinking as per WHO standard.
There will be no need
to use separate manpower to handle the RO. There are already pump operators who
can handle the newly installed RO plant.
A rough calculation
(annexure-I) shows that we can use this pond for water supply 5-6 months in our
Township.
This project does mean
to save money rather it is to set an example among refineries, an honest
responsibility towards nature and environment.
Annexure-1
|
Reservoir capacity |
1M3=1000 L |
|||||
|
L |
B |
H |
M3 |
factor |
Reservoir capacity |
KL |
|
100 |
100 |
6 |
60000 |
1000 |
60000000 |
60000 |
|
|
|
|
|
|
|
|
|
a |
water required |
|
|
|
|
|
|
b |
population at colony |
|
3000 |
|
|
|
|
b |
per day per person
reqd in Litre |
|
100 |
|
|
|
|
c |
|
|
|
KL |
|
|
|
d |
per day |
|
300000 |
300 |
|
|
|
e |
Water required for 365
days |
|
365 |
109500 |
|
|
|
f |
water available for
days |
|
|
200 |
|
|
Filtering
process-