Check list ACB, VCB, OCB, LT PANEL

Air Circuit Breaker (ACB): 
Panel 11 KV VCB type

  • Cleaning of breaker with CRC-226
  • Removal of old Grease and re-greasing the same with recommended grease
  • Check condition of arcing contact and gap between fixed and moving arcing contracts shall be checked.
  • Check condition of arcing contact and gap between fixed and moving arcing contracts shall be checked.
  • Checking the reset mechanism, tripping of breaker through push button.
  • Checking the reset mechanism, tripping of breaker through push button.
  • Checking tripping of ACB through protection release.
  • Checking presence and proper tightening of hardware.
  • Checking presence of all cir clips.
  • Checking condition and alignment of jaw contract with cradle terminals
  • Checking condition of ACB wiring and replace if required.
  • Checking and adjusting gap between hylam sheet and side plate.
  • Checking proper closing of all poles together.
  • Checking working of anti pumping device in case of EDO ACB.
  • Checking alignment of SIC and its operation.
  • Checking scrapping earth alignment.
  • Checking condition of arc chutes.
  • Checking U/V release pickup and drop off.
  • Checking ACB tripping through Shunt release.
  • Checking motor operation in case of EDO ACB.
  • Checking closing coil operation in case of EDO ACB.
  • Checking continuity and proper changeover of aux contract block.
  • Checking IR between phases – phase (ACB Closed condition).
  • Checking IR between phases – earth (ACB closed Condition).
  • Checking IR between phases – earth (ACB in open condition).
  • Setting of release as per the load.
 After the inspection, the ACB shall be checked for proper termination by mv drop Test
Vacuum Circuit Breaker (VCB):
  • Cleaning of Vacuum Circuit Breaker with CRC-226
  • Removal of old grease and re-greasing the same with recommended grease
  • Check condition of SIC Contacts
  • Checking condition and alignment of jaw Contact
  • Checking and proper tightening of hardware
  • Checking proper closing of all poles together
  • Checking of breaker tripping through push button
  • Checking and adjusting gap between hylam sheet and side plate
  • Checking motor operation in case of EDO.
  • Checking of auxiliary contacts continuity proper change over
  • Checking presence of all circlips
  • Checking IR between phase – phase (VCB closed condition)
  • Checking IR between phase – earth (VCB closed condition)
  • Checking IR between phase – earth (VCB in Open condition)
  • Any faculty spare replace by new one, which will be charged extra.
Oil Circuit Breaker (OCB):
  • Cleaning of Oil Circuit Breaker with CRC-226
  • Removal of old grease and re-greasing the same with recommended grease
  • Check condition of SIC Contacts
  • Checking condition and alignment of jaw Contact
  • Checking and proper tightening of hardware
  • Checking proper closing of all poles together
  • Checking of breaker tripping through push button
  • Checking and adjusting gap between hylam sheet and side plate
  • Checking motor operation in case of EDO.
  • Checking of auxiliary contacts continuity proper change over
  • Checking presence of all circlips
  • Checking IR between phase – phase (OCB closed condition)
  • Checking IR between phase – earth (OCB closed condition)
  • Checking IR between phase – earth (OCB in Open condition)
  • Any faculty spare replace by new one, which will be charged extra 

  




 LT Panel: We do following during regular maintenance of LT Panel
  • Cleaning of Panel Breaker with CRC-226
  • Check condition of Bus bars
  • Checking condition and alignment of jaw Contact
  • Checking and proper tightening of hardwares
  • Checking of breaker tripping through push button
  • Checking motor operation in case of EDO.
  • Checking of auxiliary contacts continuity proper change overs
  • Checking presence of all circlips
  • Checking IR between phase – phase (ACB closed condition)
  • Checking IR between phase – earth (ACB closed condition)
  • Checking IR between phase – earth (ACB in Open condition)
  • Checking of Contactor NO NC Point
  • Checking of ad on block NO NC Point
  • Checking of Control Wiring
  • Checking of Thimble Tightness
  • Checking of MCCB
  • Checking o MCB
  • Any faculty spare replace by new one, which will be charged extra.
Control Wiring: We do following during regular maintenance of Control Wiring
  • Checking of All Control Wiring
  • Checking of Contactor in NO/NC Point
  • Checking of Glass Relay in NO/NC Point
  • Checking of MCB Terminals
  • Checking of RCCB Terminals
  • Checking of Contactor Coil Resistance
  • Checking of auxiliary Contact
  • Checking of thimble of Terminals
  • Checking of indicator of Panel
  • Checking selectors switch in NO/NC Point
  • Checking of TNC Switch in NO/NC Point
  • Checking of Fuse Link Terminals
  • Checking of Timer Relay Terminals
  • Checking of Amp Meter Tightening at Terminals
  • Checking of voltage meter Tightening at Terminals

Saturday, 8 December 2012

Bibliography for BRALPOWERASSOCIATE


Hi friends!!!!
Bhagwan Prasad


The below is the references for article written on blog http://bralpowerassociate.blogspot.com

Sr.
Writer
Description
Edition
Year
01
A.S Pabla
Electrical Power  distribution
3rd
1993
02
Dr.S.L. Uppal
Electrical Power
13th
1988
03
M.L Soni, P.V Gupta,  Bhatnagar
Power system engineering
1st
1988
04
S.P.Seth
Electromagnetic field
1st
1999
05
B.R Gupta
Power system and analysis and design
3rd
1998
06
J.B Gupta
Power system
10th
2004
07
S.Rao
Switchgear protection and power system
11th
1999
08
S.Rao
Electrical substation
3rd
2005
09
S.Rao
Energy technology
3rd
2007
10
M.S Naidu
High voltage
10th
2006
11
Ashifaq Husain
Electrical machine
2nd
2005
12
D.P.Kothari and Naghrath
Modern power system
8th
2006
13
DR Nagpal
Power system
2nd
1985
14
DR VN Mittle
Design of Electrical Machine
4th
1998
15
A.K SAHNEY
Electrical machine design
5th
1984
16
B.L Theraja
Electrical machine
21st
1987
17
M.E Van
Network analysis
3rd
2004
18
Willium H.Hayat
Engineering electromagnetic

2006
19
Umesh sinha
Circuit and field theory
2nd
1999
20
Saurabh jain
Automatic control system
1st
2007
21
I.J Nagrath
Control system engineering
3rd
1999
22
R.K.Vasal
Electronic and instrument measurement
3rd
2004
23
DR Nagpal
Electrical engineering material
1st
1992
24
M/L Anwani
Basic Electrical Engg
14th
2000
25
Soni and Tiwari
Advanced control system
2nd
2008
26
Sadhu Singh
Mechanical engineering hand book
2nd
2008
27
J.B Gupta
Electronic and Electrical measurement
13th
2008
28
M/K Raina
Optical fiber communication
2nd
2008
29
A.S Chouhan
Society and environment
11th
2009
30
D.C Agarwal
Satellite and communication
6th
2008
31
Arvind Nagpal
SAP technology
1st
2004
32
Mukesh Shukla
SAP Material management
1st
2011
33
K.S Samad
SAP SD for beginners
2nd
2011
34
Bhagawan. Prasad
SAP MM PM for beginners
1st
2012
35
A.S. Chouhan
Society and environment
11th
2009
36
Chakarbarty
Circuit and field theory
5th
2008
37
S.Rao
Testing, commissioning and operation
5th
1996
38
BHEL
Handbook Of Switchgear
5th
2008
39
M.G.Say
Performance, design of AC machine
1st
1983
40
D.R.Nagpal
Utilization of Electrical energy
3rd
2003
41
Asfaq Husain
Electrical machine
2nd
2005
42
R.K Vasal
Electrical instrument
2nd
2003
43
R.K ,Garg
Electrical power generation
3rd
2005
44
B.S Mnkay
Linear control system
10th
2010
45
J.B Gupta
Electrical installation
8th
2006
46
J.B Gupta
Electrical Engg
4th
2010
47
Rajiv Shankar
Electrical System Designing
1st
2007
48
Tarlok Singh
Installation, commissioning and maintenance
2nd
2001
49
Hari Mohan Johri
Electrical installation of building
2nd
2010
50
R.S Dahiya
Substation Engg.
2nd
2010
51
M .L Anwani
Basic of Electrical Engg.
4th
2000
52
S.K Gupta
Power system
1st
2009
53
Handa
Electrical Engg
6th
1997
54
A.K Chatarji
Environment Engg
7th
2005
55
DR. M.K Raina
Optical fiber communication system
2nd
2008
56
Dr Sudhir Singh
Mech Engg hand book
2nd
2008
57
J.B Gupta
Electronics and Electrical measurement
13th
2008
58
K.M soni
Advance control system
2nd
2009
59
S.P Sukhstme
Solar energy
3rd
2012
60
Arbind Nagpal
ALE, EDI, I-Doc
1st
2002
61
SR Chintakidi
Industrial Organisation
1ST
2003
62
K.A. Samod
SAP   SD
2nd
2011
63
APJ Abdul kalam
Adamya saahas


64
DC Agrawal
Satellite communication
6th
2008
65
Dr Trilok Nath
Power electronics


66
Siemens
Power supply system
2nd
1989
67
R.B. Gupta
Material science
10th
1995
68
Gupta & Kumar
Hand book of electronics
15th
1990
69
Magazine
Power line


70
Magazine
Electrical India


71
Magazine
Lighting India


72
Magazine
Satellite India


73
Journal
The institution of Engineers (India)



74

Contact: amieclub@gmail.com

SOP, Standard Operating Procedures

  1.1 .    Definition SOP is termed commonly as Standard Operating Procedures- SOP  Characteristics of SOP- 1)     Carry out the operati...