CABLE TESTING
Standard: IEEE 400.2, IEC 60060-3, IEEE P400.2.
1. Cable sheath Testing
2. Insulation Resistance Testing
3. VLF AC withstand test
4. DC Hipot of Cables
5. Cable Fault Localization
6. Pin Pointing of fault in cables and Route Tracing,
7. Partial Discharge (PD) measurement ( Online/ offline)
8. Cable Identification.
9. VLF Testing available upto 132kV cable
TRANSFORMER TESTING
Standard : IEC 60270 (for PD) , IEC60060-1 IEC
1. Turns Ratio and Vector Group Measurement
2. Magnetic Balance and Magnetizing Current Measurement
3. % Impedance Measurement at Low Voltage Insulation Resistance & Polarization Index Measurement.
4. DC Winding Resistance Measurement.
5. Dynamic Contact Resistance Measurement of OLTC SFRA ( Sweep Frequency Response Analysis ) Testing 60060-3,IEC
6. Tan Delta and Capacitance Measurement.
7. Partial Discharge ( PD) Measurement (Online & Offline)
8. Magnetic Circuit ( Insulation ) Test
9. Functionality Check of all Protective Devices stability Check
10. Oil Analysis
ON LINE MOTOR TESTING –
1. Motor Current Signature Analysis (MCSA)
2. Vibration Analysis
3. Ultrasonic Detection
4. Thermography (IR)
5. Partial Discharge (PD)
6. Bearing Problem Analysis
OFFLINE MOTOR TESTING
STATOR
1. Surge Test upto 50kV
2. Insulation Resistance & Polarization Index Measurement
3. Dielectric Absorption Test
4. Step Voltage Test
5. DC / AC Hipot Test
6. Impedance Test
7. Bearing Problem Analysis
8. Current Frequency response
9. Phase Angle
10. Winding Resistance Measurement
11. Partial Discharge Measurement
12. Capacitance and Tan Delta Measurement
ROTOR
1. Insulation Resistance & Polarization Index Measurement
2. Impedance Measurement
3. Winding Resistance Measurement.
GENERATOR TESTING
1. Insulation Resistance and Polarization Index.
2. Capacitance and Tan Delta Measurement
3. Partial Discharge Measurement
4. DC/AC Leakage Current Measurement (Hipot )
5. DC Winding Resistance Measurement
SWITCHGEAR TESTING
1. Surface Tracking
2. Corona
3. Partial Discharges within insulators and insulating components
4. Defective insulations in cable terminations
5. Surface contaminations or moisture
6. Defective potential transformers and current transformers
7. Defects in circuit breaker insulation structure
RLA (RESIDUAL LIFE ASSESSMENT) STUDY OF TRANSFORMER
1. Online test i.e. Infrared thermography, External inspection, routine oil tests of main tank and LTC, DGA & Furan.
2. Operation of fan and pumps.
3. Offline tests i.e. Capacitance and tan delta, ratio, Winding resistance Insulation resistance, polarization index, magnetic balance, SFRA, DCRM of LTC etc.
4. Moisture analysis of paper insulation
METHOD UTILIZED FOR THE DETECTION OF PARTIAL DISCHARGE:
1. Acoustic : Band Width- 20kHz – 300kHZ
2. TEV ( Transient Earth Voltage) : Band Width – 3MHZ-100 MHZ
3. UHF ( Ultra High Frequency) : Band Width – 300MHZ- 1500MHZ
4. HFCT ( High Frequency Current Transformer) : Band Width – 500kHz – 50 MHZ
5. Ultrasonic : Band Width – 40kH
POWER QUALITY MONITORING & ANALYSIS
Standard: IEC 61000-4-30
1. It can record and analyze different types of power quality parameters such as voltage, current, harmonic, frequency, fluctuation, flicker, swell, sag, power and three-phase unbalance of power supply line
OVER CURRENT/EARTH FAULT RELAY(50/51/50N/51N/67/67N)
1. Pickup , Drop off & Threshold Test
2. I-t characteristics curve test
3. MTA test of Directional Relays,Tracing of Angle Limit
4. Curve Analysis
DIFFERENTIAL RELAYS(87)
1. IDIFF.Pickup Test
2. Stability Check,Biasing ,Over Flux Test
3. 3rd Harmonic Test
4. Analysis of ID-IR graph & Restraining Characteristics
OVER/UNDER VOLTAGE RELAYS(27/59/91)
1. Delta Ramp Test
2. Pickup,Drop off Test
3. Zone test of Voltage Directional Relay
4. Curve Analysis
DISTANCE RELAYS(21)
1. Impedance Evaluation in Z-plane
2. Finding the R/X characteristics&Z-t diagram
3. Testing of the voltage dependent overcurrent starting function
4. of distance relays
Subscribe to:
Post Comments (Atom)
SOP, Standard Operating Procedures
1.1 . Definition SOP is termed commonly as Standard Operating Procedures- SOP Characteristics of SOP- 1) Carry out the operati...
-
Winding and weight of induction and submersible motor – winding weight and motor weight Typical motor, 3 Ph, 40 H, 415v Sr. ...
-
Busbar Bus bar A bus bar (also spelled busbar, buss bar or busbar), is a str...
-
TRANSFORMER 11/0.415 KV Sr TR KVA Un tanking Mass (core+ winding), KG Oil Mass, KG Total mas...
Niman Power
ReplyDeleteWith the swift increase of technology, the demand for electrical engineers who can create, comprehend, and modify electrical control systems. You can also check out about Best College for Electrical Engineering in India here.
ReplyDeleteGreat.
ReplyDeleteClipping Path Service