Substation audit questionnaire
Substation internal audit should be done yearly basis. It is advisable to have a checklist and to be audited on regular interval. Good ambience will have better operational facility and long life of substation equipment.
1. Is authorized person list are updated?
2. Is (SLD) single line diagram is updated?
3. Is insulation mats are laid in front of and back to all panels?
4. Is SOP standard operating procedure is updated?
5. FLP light, EX fan, Detector and shower are installed in battery bank?
6. Civil job of battery banks including eye shower, mirror, drain pipe, water availability, wash basis, door lock, floor cleaning.
7. Is Substation door/ window/ventilator glasses broken &closing issue are rectified?
8. Is there any false ceiling/flooring abnormalities?
9. Is Substation lighting sufficient
10. Is Sprinkler system status updated?
11. Any issue pertaining to Sprinkler/Deluge system bilingual SOP preparation and flex board printing and installation-
12. Is battery bank Do’s and Don’ts board provided ?
13. Is DC lighting report available?
14. Is Emergency handling scenario handbook available?
15. Is TR yard free from vegetation, get locked.
16. Is Scraps/spare materials dumped in substation and cable cellar removed?
17. Is Substation roof leakage/water proofing job completed?
18. Is Operator/shift in-charge log book signing checked regularly?
19. is locking of Substation door /TR yard gate wherever missing?
20. Is hazardous area classification displayed in manned location?
21. Is ARC suit availability in manned locations checked?
22. Is Splash suit in manned locations for battery bank job available?
23. Is PPEs (HT/LT Hand gloves, Discharged rod, HT tester) available in manned location?
24. Is measuring tools calibrated?
25. Is fire Extinguisher placement done at marked area ?
26. Is status of Earth pit value and condition report available?
27. Is flex boards of SLD, Shock treatment chart, Do’s & Don’ts, physical layout, Important Telephone number displayed?
28. Is any deviation in LOTO audit available?
29. Is Breaker lifting trolley testing report available?
30. Is missing Sand/fire bucket, Sand filling done regularly?
31. Is substation floor/TR yard cleaning done regularly?
32. Is pressurization blower available, manometer provided?
33. Is danger plates provided as voltage grade?
34. Is danger Sticker on HT/LT panels in all substations provided?
Saturday 17 August 2024
Possible cause of electrical failure
Due to the gap or deviation during the electrical operation and maintenance electrical failure takes places and sometimes it becomes so fatal.
a) Safety
1) Not using PPE
2) Poor lighting
3) In/exit path missing
4) Using non-standard tools
5) Not using LOTO
6) Wrong tag marking
7) In sufficient fire detector, fire extinguisher
8) Improper SOP for energisation/de-energisation
b) Monitoring issue
9) Irregularity in in taking reading
10) Relay failure
11) Irregularity in PM
12) Time coordination with up stream
13) Setting coordination with up stream
14) Numerous alarm
15) Irregularity in in taking reading of UPS, Battery charger
16) High temperature in VFD/UPS room
c) Marking on panel
17) Feeder cubical name
18) Rating
19) Fuse rating
20) Cable size
21) Special marking
d) Functional
22) non availability of emergency light for power restoration
23) Auto failure of bus coupler
24) Spare short fall
25) Non availability of testing equipment
26) ill weather
27) poor maintenance
e) Fire Hazard
28) flammable material in cable cellar
29) Non FLP equipment in battery room
30) Improper spacing of fire extinguisher
31) Hydrocarbon ingress in substation
32) Failure of insulation
f) Furious tripping
33) Wrong relay setting
34) Wrong operation
35) Wrong sequence of operation
36) Wrong control circuit
37) Breaker failure
38) Poor scheme
39) Poor design
g) Flashover
40) Failure of end termination
41) Lizard entry
42) Unwanted light on at night
43) Aging of equipment
44) CT/PT failure
45) Water ingress in JB/DB
46) Rodent entry
47) Moisture ingress
48) Poor ventilation
49) Fire in capacitor of AC
h) Knowledge gap
50) Lack of training
51) Lack of knowledge
52) Improper monitoring
Subscribe to:
Posts (Atom)
Substation audit questionnaire
Substation internal audit should be done yearly basis. It is advisable to have a checklist and to be audited on regular interval. Good ambi...
-
Winding and weight of induction and submersible motor – winding weight and motor weight Typical motor, 3 Ph, 40 H, 415v Sr. ...
-
Busbar Bus bar A bus bar (also spelled busbar, buss bar or busbar), is a str...
-
Cable size for DG set TYpe: copper Rating (kva) phase current size per pha...