Sara Construction & Engineer
Site: Bral engineering company, Ghaziabad
Transformer oil filtration report
Job Ref: --------------------------
Report No  ………………                                                                    Date:……………………..
Transformer no-……………              …………… Substation no- ………………………………..
Oil Capacity …………….Transformer KVA …… ……Voltage……..        ..Sr. no …………
BDV in KV (before staring of filtration)…………
Filtration m/c capacity: ………..L/M, temperature setting: …………deg.C,                     
IR value HT side with 2500V megger…….M-ohm
Reading :
Sr
Date
Time
Oil temperature
Pressure (hg)
Heater current
BDV
Remarks
1







2







3







4







5








If any ……………….
Transformer is reedy for charge or not………………….
Supervisor----------                                                                                 Operator sign ------------
IR Value:
Transformer charge date and time----------------------------
Remarks …………………………………….
Engineer sign -----------

No comments: