Sara Construction & Engineer
Site: Bral engineering company, Ghaziabad
Transformer
oil filtration report
Job
Ref: --------------------------
Report No
……………… Date:……………………..
Transformer
no-…………… …………… Substation
no- ………………………………..
Oil Capacity …………….Transformer KVA …… ……Voltage…….. ..Sr. no …………
BDV in KV (before staring of filtration)…………
Filtration m/c capacity: ………..L/M, temperature
setting: …………deg.C,
IR value HT side with 2500V megger…….M-ohm
Reading :
Sr
|
Date
|
Time
|
Oil temperature
|
Pressure (hg)
|
Heater current
|
BDV
|
Remarks
|
1
|
|
|
|
|
|
|
|
2
|
|
|
|
|
|
|
|
3
|
|
|
|
|
|
|
|
4
|
|
|
|
|
|
|
|
5
|
|
|
|
|
|
|
|
If any ……………….
Transformer is reedy for charge or not………………….
Supervisor----------
Operator sign ------------
IR Value:
Transformer charge date and
time----------------------------
Remarks …………………………………….
Engineer sign
-----------