Xyz Company
uvw nagar , India
REF.NO--------------
DATE-------
TEST REPORT
CUSTOMER :
ORDER REFERENCE :
PRODUCT :
PANEL SR.
NO------------ DRAWING NO. ---------------- QUANTITY
----- ----
SYPPLY VOLTAGE ………………. CONTROL VOLTAGE ……………… AMPERE ------------
The following
routine test and inspection were carried out on the above control panel.
GENERAL
INSPECTION
- Verification of bill of material and rating of components ---------------------------------
(As per drawing
no……………………………………..
- Overall &Mounting of dimension of panel -------------------------------
(As per drawing
no……………………………………..
- Power wiring and control wiring of components ---------------------------------
(As per drawing
no……………………………………..
- Paint finish and overall appearance --------------------------------
(Inside
……………………………outside……………………..
ELECTRICAL
OPERATION AND TEST
- Verification of control transformer ------------------------------------
- Verification of proper function of all components ---------------------------------
- Verification of correct sequence of operation ----------------------------------
DI-ELECTRIC
TEST
- High voltage test conducted at -------KV Voltage for 1 minute seconds
- Between each pole and earth ---------------------
- Between the poles when contacts are open ---------------------
INSULATION
RESISTANCE TEST
- Measurement of insulation resistance with 500/1000V DC Megger Mega –ohm
- Between each pole and earth ---------------------
- Between the poles when contacts are open ---------------------
Client’s Rep………………………….. Tested by ………………
Reviewed by ………………….
For
xyz co.
OUTDOOR PANEL TEST REPORT SEMPLE